BiC header Icon
  • Home
  • About Us
    • Bhuri Industrial Consulting PVT LTD
      +91 98791 02927
      info@bhuriconsulting.com
    • About Us
    • Our Leadership Team
    • Success Story
    • Testimonials
  • Our Offerings
    • Bhuri Industrial Consulting PVT LTD
      +91 98791 02927
      info@bhuriconsulting.com
    • Our Offerings
    • 100% reliable plant operation
    • Clean plant
    • Cost-efficient operation
    • Employee culture transformation
    • Fire detection and protection in high potential area
    • Gemba kaizen process implementation
    • Management of change (MOC) in plant
    • No fire incident.
    • No loss time injury. (Zero LTI)
    • System and procedure to avoid mistakes
    • Trip bypass & alarm management
    • USE of IT and AI
    • World-class O&M practice
    • Zero leak plant
  • Case Study
    • Bhuri Industrial Consulting PVT LTD
      +91 98791 02927
      info@bhuriconsulting.com
    • All Case Studies
    • Power and steam Generation Case Studies
    • Utility Case Studies
    • Chemical Case Studies
    • Oil & Gas Case Studies
    • Fertilizers Case Studies
    • IT – IoT industry 4.0 Case Studies
    • Steam desalination and RO plant Case Studies
    • Cement Plant Case Studies
  • Industry
    • Bhuri Industrial Consulting PVT LTD
      +91 98791 02927
      info@bhuriconsulting.com
    • Industry
    • Power and steam Generation Industry
    • Chemical Industry
    • Oil and Gas Industry
    • Steam desalination and RO plant Industry
    • Utility Industry
    • Fertilizers Industry
    • IT – IoT industry 4.0 Industry
    • Cement plant Industry
  • Contact Us
Menu
  • Home
  • About Us
    • Bhuri Industrial Consulting PVT LTD
      +91 98791 02927
      info@bhuriconsulting.com
    • About Us
    • Our Leadership Team
    • Success Story
    • Testimonials
  • Our Offerings
    • Bhuri Industrial Consulting PVT LTD
      +91 98791 02927
      info@bhuriconsulting.com
    • Our Offerings
    • 100% reliable plant operation
    • Clean plant
    • Cost-efficient operation
    • Employee culture transformation
    • Fire detection and protection in high potential area
    • Gemba kaizen process implementation
    • Management of change (MOC) in plant
    • No fire incident.
    • No loss time injury. (Zero LTI)
    • System and procedure to avoid mistakes
    • Trip bypass & alarm management
    • USE of IT and AI
    • World-class O&M practice
    • Zero leak plant
  • Case Study
    • Bhuri Industrial Consulting PVT LTD
      +91 98791 02927
      info@bhuriconsulting.com
    • All Case Studies
    • Power and steam Generation Case Studies
    • Utility Case Studies
    • Chemical Case Studies
    • Oil & Gas Case Studies
    • Fertilizers Case Studies
    • IT – IoT industry 4.0 Case Studies
    • Steam desalination and RO plant Case Studies
    • Cement Plant Case Studies
  • Industry
    • Bhuri Industrial Consulting PVT LTD
      +91 98791 02927
      info@bhuriconsulting.com
    • Industry
    • Power and steam Generation Industry
    • Chemical Industry
    • Oil and Gas Industry
    • Steam desalination and RO plant Industry
    • Utility Industry
    • Fertilizers Industry
    • IT – IoT industry 4.0 Industry
    • Cement plant Industry
  • Contact Us
  • Filter by
  • Categories
  • Show all
  • All
  • All Case Studies
  • Safety Management System Implementation

    Read more
    engineer use augmented reality software on tablet
    Safety Management System Implementation
    0
    Date
    June 12, 2023
    Industries often viewed accidents as inevitable and acceptable. However, a multinational corporation (MNC) faced significant challenges in improving its safety management system due to legal compliance requirements and the need to address serious incidents. This led to a change in management and their mindset, highlighting the importance of safety across all levels of the organization.
  • CFBC Boiler’s reliability challenge threatens business survival, but BiC Promoter’s success case study offers hope

    Read more
    power plant
    CFBC Boiler’s reliability challenge threatens business survival, but BiC Promoter’s success case study offers hope
    0
    Date
    June 9, 2023
    This case study focuses on a CFBC (Circulating Fluidized Bed Combustion) boiler that experienced poor performance due to fouling issues. The company sought the expertise of BiC Promoter to address the problem and achieve satisfactory boiler operation. This report presents a detailed account of the situation, the problem statement, the study, and planning undertaken, the proposed solution, implemented actions, and the ultimate conclusion.
  • Optimization of Boiler Shutdown Timing

    Read more
    oil refinery power plant
    Optimization of Boiler Shutdown Timing
    0
    Date
    June 9, 2023
    This paper presents a case study conducted in a chemical plant with a cogeneration facility, focusing on optimizing boiler shutdown timing to enhance availability and reliability and minimize downtime during annual inspections. The study addresses two key problems faced by the plant, namely scaling in the furnace and prolonged annual shutdown periods required for repairs, replacements, cleaning, and inspections. The assigned  BiC promoter from a consulting firm took charge of implementing improvements and demonstrated effective leadership throughout the process. This paper outlines the approach adopted for each problem, the action points undertaken, and the corresponding results achieved.
  • Instrumentation Reliability in Process Plants

    Read more
    Instrumentation Reliability in Process Plants
    0
    Date
    June 9, 2023
    BiC, a consulting firm with extensive experience in instrumentation, mechanical, electrical, civil projects, and IT systems including AI, recognizes the crucial role of instrumentation in automated plants. While automation has led to manpower reduction, the reliability of instrumentation remains a key factor in ensuring process safety, profitability, and customer satisfaction. a case study on improving instrumentation reliability using AI in power plants, chemical industries, Cement, Oil and Gas, and many more.
  • Margin Improvement Through Strategic – A Bold Decision

    Read more
    oil refinery plant industrial factory building
    Margin Improvement Through Strategic – A Bold Decision
    0
    Date
    June 9, 2023
    The oil and gas industry demands significant financial investments, involving risks, from conceptualization to operations. The success and profitability of companies in this sector depend on key strategic decisions. This case study focuses on a significant margin improvement achieved through a bold decision by the promoter of BiC, an industrial consulting company.
  • Plant Safety Management Process Implementation

    Read more
    RO system water drinking plant
    Plant Safety Management Process Implementation
    0
    Date
    June 8, 2023
    Historical safety mindset: In the past, industries operated with the belief that a certain number of accidents, including some fatalities, were inevitable and acceptable. BiC's expertise: BIC is a consulting firm specializing in industrial consultancy, particularly in safety management system implementation.
  • Catastrophic Fire in Captive Cogeneration Power Plant

    Read more
    Catastrophic Fire in Captive Cogeneration Power Plant
    0
    Date
    June 8, 2023
    A case study on a catastrophic fire incident that occurred in a chemical plant's captive co-generation power plant. The fire resulted in extensive damage to the power plant, including the complete destruction of electrical infrastructure, turbines, and buildings. The study highlights the importance of Process Safety Management (PSM) in preventing and mitigating such accidents and incidents in industrial processes. The investigation identified various factors contributing to the incident, such as a detached recently repaired servo, inadequate management of change, and challenges in the organizational safety culture. The paper discusses the lessons learned, actions taken, and outcomes achieved to restore operations and enhance process safety management.
  • Densh Plant Product Failure in Quality Test Consistently for Months

    Read more
    oil gas refining petrochemical factory
    Densh Plant Product Failure in Quality Test Consistently for Months
    0
    Date
    June 8, 2023
    This case study focuses on a mechanical brickett manufacturing plant in chemical plant, known as the Densh Ash Plant, which faced significant challenges resulting in the accumulation of rejected finished products. Despite various attempts by experts, the problem persisted, hampering production. The objective of this case study is to present a systematic and professional approach to resolving the issues at the plant.
  • Overcoming Fertilizer Plant Commissioning Challenges

    Read more
    Overcoming Fertilizer Plant Commissioning Challenges
    0
    Date
    June 8, 2023
    Provide background information on the project, emphasizing the challenges faced by a well-known group in setting up a fertilizer plant in northern India. Highlight the criticality of the equipment ordered from a government-owned South Indian company, which had a monopoly in supply and quality production. Explain the lack of communication facilities during the 90s, making it difficult to address project issues and delays.
12
Next page
BiC footer logo
Bhuri Industrial Consulting Private Limited
We offer customized solutions to meet your business needs. Our expert team combines industry knowledge, innovative strategies, and a client-centric approach for tangible results. Contact us now to discuss how we can help your business succeed in the changing industrial landscape.
Linkedin-in Facebook-f Twitter
Company
  • Home
  • About Us
  • Our Offerings
  • Industry
  • Case Study
  • Contact Us
Menu
  • Home
  • About Us
  • Our Offerings
  • Industry
  • Case Study
  • Contact Us
Important Links
  • Our Leadership Team
  • Success Story
  • Terms and Conditions
  • Privacy and Policy
Menu
  • Our Leadership Team
  • Success Story
  • Terms and Conditions
  • Privacy and Policy
Important Links
304 - Shailraj Tower Suryavansi tower Road Vastrapur - Ahmedabad Pin - 380015
+91 98791 02927
info@bhuriconsulting.com
Copyright 2025. All rights reserved by
Bhuri Industrial Consulting Private Limited (BiC)
Designed & Developed by StackDot.
info@stackdot.in   +91 95863 04063
1978 - 1988 Tata Chemicals, Mithapur.
Challenge Instrumentation frequent failure, trappings due to air line failure. Business Impact Profitability. Solutions implemented after RCA and study I took responsibility to set right Entire airline and associated like air filters etc converted to SS316 and atlas copco with MD 6 Dryer to avoid moisture in air line.Outcome No instrument failure thuse, loss preventes.
Next
21978 - 1988 Tata Chemicals, Mithapur.
Challenge Instrumentation frequent failure, trappings due to air line failure. Business Impact Profitability. Solutions implemented after RCA and study I took responsibility to set right Entire airline and associated like air filters etc converted to SS316 and atlas copco with MD 6 Dryer to avoid moisture in air line.Outcome No instrument failure thuse, loss preventes.
Next
31978 - 1988 Tata Chemicals, Mithapur.
Challenge Instrumentation frequent failure, trappings due to air line failure. Business Impact Profitability. Solutions implemented after RCA and study I took responsibility to set right Entire airline and associated like air filters etc converted to SS316 and atlas copco with MD 6 Dryer to avoid moisture in air line.Outcome No instrument failure thuse, loss preventes.
Next
41978 - 1988 Tata Chemicals, Mithapur.
Challenge Instrumentation frequent failure, trappings due to air line failure. Business Impact Profitability. Solutions implemented after RCA and study I took responsibility to set right Entire airline and associated like air filters etc converted to SS316 and atlas copco with MD 6 Dryer to avoid moisture in air line.Outcome No instrument failure thuse, loss preventes.
Next